It is suggested to form a team comprising
of decision-makers, engineering and production mangers.
This ensures Client's participation and facilitates comprehensive
data collection and analysis. The team ensures immediate
and correct evaluation of all suggestions.
The basic study is conducted in two visits,
spread over a period of 30 to 60 days. The data collection
and analysis is jointly carried out at site. This generates
practical suggestions by weeding out errors, anomalies and
controversies. A site report is prepared & discussed
during each visit; also to finalize action plan & implementation
schedule. This ensures collective responsibility and facilitates
speedy implementation.
Further, visits are planned at periodical
intervals to provide necessary support during implementation
and monitor actual savings. A visit report also documents
progress of implementation, actual savings, difficulties
& trouble shooting activities.
The overall duration of the study is around
six months. This ensures coverage of as many potential areas
as possible and helps in devising control & monitoring
system.
The final report is presented at the end
of the studies.
|